Verified Via: Mobile

Member Since: Nov 2019

Number of Active Ads: 11

Welcome To BGM Boreholes...

Refine Search

Share

Water Tank installations
USD 500  |
ZWL 8,900
  • Harare CBD

Water Tank installations

Automatic Irrigation System
  • Harare CBD

We supply and install smart water kit which automatically irrigates crops ideal for market gardening. The smart watering kit comes with a pump ,soil moisture sensors, water switc...

Borehole Drilling Services
USD 1,500  |
ZWL 26,700
  • Harare CBD

Borehole Drilling Services After the water survey has taken place, the borehole drilling can proceed at the identified spot. Once the drilling commences, communication with the cl...

Borehole cleanouts Flushing / cleanout of existing boreholes and recasing
  • Harare CBD

BOREHOLE CLEANOUTS Flushing / cleanout of existing boreholes and recasing if necessary.

Borehole Pump Installations
  • Harare CBD

Boreholes can be equipped with either submersible pumps (electric or solar) or with bush pumps type B (manual). The size of the pump to be installed will depend on : The clients’...

Water Tank Stand Installations
USD 500  |
ZWL 8,900
  • Harare CBD

Water Tank Stand Installations

Borehole Construction
USD 1,302  |
ZWL 23,176
  • Harare CBD

Our rigs can drill to a depth of 450m and we case with either 180mm casing to the hard rock or with 140mm entirely, depending on the formation of the ground The borehole casing eff...

SITING ( Water Surveying)
USD 100  |
ZWL 1,780
  • Harare CBD

SITING ( Water Surveying) Borehole Site Survey Quote Before drilling a borehole you need to establish exactly where to drill. This is done by using equipment to select the propos...

Borehole Irrigation solar systems installation
  • Harare CBD

SOLAR SYSTEMS We supply and install solar equipment for domestic, commercial and agricultural needs and very competitive rates. Our service delivery is unparalleled.

Borehole Capacity testing
  • Harare CBD

We offer the services of Borehole capacity testing at reasonable prices. An often overlooked step, Capacity testing is used to determine the maximum sustainable drawdown on the bor...

Showing 1 - 11 of 11
Page 1 of 1